Saturday, March 29, 2014

bathroom remodel

We decided it was time to remodel the downstairs bathroom.  We had lots of fun (sarcastic) tearing out the old, especially the vinyl flooring.  That was a killer and we never want to do that again -- scraping the floor with a razor blade.
 Mark cut out the old fiberglass shower enclosure -- a look at the studs and pipes in the shower.
 We got rid of the old vanity and lighting.
 We hired Tom Rosemann to do all the tile.  Here's the beginning of building the new shower.
 Prepping the shower walls and floor for the tile.
 Tile set in the shower.
 Shower complete!
 Shower & floor completed with the toilet and new vanity back in place.
Since this picture we have put a new white top on the vanity, put the towel racks, mirror and new light fixture back on the walls as well.  LOVE the new bathroom!

No comments: